Profile

G.C. Grünkraft S.A. was founded in Greece in 2011 as the partner of Schuco International K.G. for the installation of Solar Mounting Structures systems and has quickly established itself within the leaders in PV technology installations. Our unique methodology in optimizing the field and the installation of mounting systems provides higher Yield and maximizes the Return on Investment.
With own heavy duty machinery (3 ramming machines, 1 wagon drill, 1 bobacat) Grünkraft has built up to date more than 320 MW. Together with 6 sigma methodology our team achieves unequal quality, accuracy, and speed in the installation process.
As of 2019 Grünkraft entered the field of Greenfield Project development having bring into R-T-B status 404MW while in total more than 900MW of solar projects at medium stage development.
The prominent place in our partners and customers indicates that our long experience in geotechnical engineering and photovoltaic projects gives us strength in a highly competitive environment. Adherence to procedures and implementation with accuracy define our principles.

Conception:

GeoModelling & Lab tests, Concept Study & Design, Project Management, 6σ Construction
Screen Shot 2016-04-29 at 01.39.28