To achieve the absolute horizontal result for the maximum solar absorption, in the case of concrete foundation in rocky ground formations, drillings are designed with variable depths in accordance the static study of the mounting systems.

Linocuts are designed prior to drilling, are optimised on paper based the contour lines and then are again optimised in situ upon GPS measurements.

Screen Shot 2016-04-28 at 11.33.21

Inclination points are then designed:

Screen Shot 2016-04-28 at 11.34.58