G.C. Grünkraft S.A. was founded in Greece in 2011 as the partner of Schuco International K.G. for the installation of Solar Mounting Structures systems and has quickly established in Greece itself within the leaders in PV technology installations
With own heavy duty machinery (ramming machines, wagon drills, bobcats) Grünkraft has built up to date more than 520 MW of Solar PV projects while it has succesfully co-developed and brought to R-T-B status 480 MW of Solar PV projects and 100 MW of BESS projects.
By applying 6 sigma methodology our team achieves unequal quality, accuracy, and speed in the installation process.
As of 2019 Grünkraft entered the field of Greenfield Project development having brought into R-T-B status 480 MW while in total more than 900MW of solar projects at medium stage development. At the same time Grünkraft became preferred BOS parrtner of Multinational corporations for the construction of Solar PV projects in Greece.
The prominent place in our partners and customers indicates that our long experience in geotechnical engineering and photovoltaic projects gives us strength in a highly competitive environment. Adherence to procedures and implementation with accuracy define our principles.
From Conception to Implementation:
GeoModelling & Lab tests, Concept Study & Design, Project Development, Project Management, 6σ Construction, O&M.